A hotel furniture RFQ should tell suppliers what to make, how many pieces to price, which finishes to use and where the furniture needs to arrive. Give every bidder the same information and ask them to state their assumptions. That gives the project team a basis for comparing quotes before samples or drawings are final.
Start with a room-by-room furniture schedule
Give each item a code and tie it to a room type or public area. For a guestroom desk chair, record the quantity per room, the number of rooms using that chair and any spare units. Break out variants when the dimensions, finish or handing change. A left-hand bedside cabinet and its right-hand counterpart may share a design, but the factory and installer need to tell them apart.
What to send with the RFQ
- Item codes, room types, quantities per room and total quantities, with spares shown separately.
- Current plans, elevations or reference images, with revision dates and any dimensions that affect fit.
- Material and finish references, hardware requirements and any alternatives the supplier may propose.
- Delivery address, required-on-site dates and any limits on receiving, storage or installation.
Show suppliers where the design can change
Mark the requirements that are fixed and the decisions still open. For an upholstered headboard, confirm whether the fabric is nominated, whether substitutes are permitted and whether the mounting system is already defined. Ask the supplier to price the specified version first and list each option separately, with its effect on appearance, price and lead time.
Put packing, freight and installation on the same basis
State where the supplier’s responsibility ends and who receives, unloads and installs the furniture. If the hotel will stay open during refurbishment, share the floor release sequence and any restrictions on loading bays, lifts or delivery hours. Ask whether cartons can be labelled by floor or room type, and whether hardware is packed with the relevant item.
Compare the inclusions before comparing unit prices
Two headboard quotes can show the same dimensions while covering different scopes. One may include the nominated fabric, mounting rail and export packing. The other may allow for a standard fabric and quote the rail separately. Compare each item against the same drawing revision and ask suppliers to flag exclusions next to the relevant line item.
Ask what starts the quoted production lead time. Record the expected dates for shop drawing review, finish sign-off and sample approval, then check the programme against the date the contractor needs the furniture on site.
Frequently asked questions
Can I request a quote before the drawings are final?
Yes. Share the room matrix, preliminary dimensions and finish intent. Ask for an indicative quote with assumptions listed, then reconcile those assumptions against the approved drawings before placing the order.
Should samples and prototypes be included in the RFQ?
Yes, if you need them for approval. Specify whether you need finish swatches, a full prototype or a mock-up room. Ask suppliers to show sample costs, shipping and lead times separately, and explain how a revised sample would affect the programme.